What Happens During a Kitchen Remodel, Phase by Phase

November 2, 2026

Most homeowners know roughly what a finished kitchen should look like. Far fewer know what happens between the day the old cabinets come out and the day the new range gets plugged in. That gap is where frustration starts: weeks where nothing visible seems to change, inspections that hold up the schedule, and decisions that suddenly feel urgent. Understanding the sequence ahead of time makes the whole project calmer and usually faster.

Here is how a typical full kitchen remodel unfolds, phase by phase, and what you should be doing at each step. Every project is different, and older homes around Phoenixville, Pottstown, and the rest of Chester and Montgomery Counties tend to add a few surprises, but the order of operations stays remarkably consistent.

Phase 1: Preconstruction and Selections

The most important work happens before anyone swings a hammer. During preconstruction, the layout gets finalized, the scope gets written down, and the major products get chosen. In a kitchen, that means more than picking a countertop color.

  • Appliances first. Cabinet sizes, electrical circuits, gas lines, and ventilation all depend on the exact models. Get spec sheets for the range, hood, refrigerator, dishwasher, and microwave before cabinets are drawn.
  • Cabinets and lead times. Semi-custom and custom cabinets can take many weeks to arrive. Ordering them late is one of the most common reasons a kitchen schedule slips.
  • Sink, faucet, and plumbing fixtures. Undermount sinks need to be on site when the countertop fabricator templates.
  • Lighting plan. Recessed, pendant, and under-cabinet lighting locations should be set before rough electrical.
  • Flooring. Decide whether new flooring runs under the cabinets or stops at them.

This is also when permits are applied for. Most townships require permits for kitchen work that touches electrical, plumbing, gas, or structure, and requirements vary from one municipality to the next. Your contractor should know the process, but it is worth confirming with your township what applies to your project.

Phase 2: Protection and Demolition

Before demolition, the rest of the house gets protected: floor coverings along the work path, dust barriers at doorways, and covered HVAC returns so drywall dust does not spread through the ductwork. If you plan to live at home during the remodel, this is a good time to set up a temporary kitchen with a microwave, a small refrigerator, and a utility sink or laundry tub nearby.

Demolition usually goes quickly. What it reveals matters more. Once walls and floors are open, you may find rotted subfloor under the old sink, undersized or ungrounded wiring, galvanized plumbing, or framing that was cut years ago to fit a duct. In older southeastern PA homes, it is common to find several layers of past renovations stacked on top of each other. A good contractor walks you through these findings right away and explains your options before the work continues.

Phase 3: Rough-In Work

Rough-in is the stretch where the kitchen looks the least finished but the most important work gets done. It typically happens in this order:

  1. Framing and structural changes. Removing or opening a wall, adding a beam, building out soffits, or blocking for heavy upper cabinets and range hoods.
  2. Plumbing. New supply and drain locations for the sink, dishwasher, refrigerator water line, and pot filler if you have one.
  3. Gas. Relocating or adding a line for a gas range or cooktop.
  4. Electrical. New circuits for appliances, countertop receptacles, lighting, and switches.
  5. HVAC and ventilation. Ducting the range hood to the exterior and adjusting heating and cooling registers to suit the new layout.

Walk the space during rough-in with your plans in hand. Check outlet heights, switch locations, and where the pendant boxes land over the island. Moving a box now takes minutes. Moving it after drywall and tile means patching and repainting.

Phase 4: Inspections and Insulation

When rough-in is complete, the township or its third-party inspection agency inspects the work before the walls are closed. Depending on the scope, that may include separate framing, plumbing, and electrical inspections. Scheduling depends on the inspector’s availability, so a few days of waiting here is normal and should be built into the timeline.

Once rough inspections pass, exterior walls get insulated. In older homes this is a real opportunity: kitchen exterior walls are often under-insulated, and opening them is the cheapest chance you will have to fix that.

Phase 5: Drywall, Flooring, and Paint

Drywall goes up, gets taped, and gets finished, which takes several days because each coat of compound has to dry. Many builders prime and paint the walls before cabinets go in, then do a final touch-up coat at the end. If your new flooring runs wall to wall, it typically goes down now, before cabinets, and gets protected for the rest of the job.

Phase 6: Cabinets and Countertop Templating

Cabinet installation is where the kitchen starts to look like a kitchen. Walls and floors in older houses are rarely flat or level, so careful shimming and scribing matter. This is also where trim details like filler strips, panels, crown molding, and light rail come together. When the carpentry crew is in-house, as it is with McClave Builders, those details and any field adjustments stay under the same roof instead of waiting on another subcontractor.

After the base cabinets are set and secured, the countertop fabricator comes out to template. Stone countertops are then fabricated off site, which commonly takes one to a few weeks depending on the shop and material.

Phase 7: Countertops, Backsplash, and Finish Trades

  • Countertop install, including sink mounting and cutouts.
  • Backsplash tile, which must wait for countertops so the tile sits on the finished surface.
  • Plumbing finish: faucet, disposal, dishwasher hookup, and refrigerator water line.
  • Electrical finish: devices, cover plates, light fixtures, and under-cabinet lighting.
  • Appliance installation and hood connection.
  • Cabinet hardware, final adjustments to doors and drawers, and paint touch-up.

Phase 8: Final Inspection and Punch List

Once the work is complete, the township performs final inspections on the permitted trades. Then comes the punch list: walk the kitchen with your contractor, open every door and drawer, run every appliance, test every switch, and note anything that needs attention. A clean, organized closeout is a good sign of how the rest of the job was managed.

How Long Does It All Take?

Timelines vary widely with scope, product lead times, inspection schedules, and what turns up behind the walls. A layout-in-place refresh moves much faster than a remodel that removes a wall or relocates plumbing. The biggest controllable factor is preconstruction: when selections are made and materials are ordered before demo, the on-site phases run with far fewer gaps. Winter is a practical time to plan, since kitchen work happens indoors and selections can be finalized while lead times are known.

Planning a Kitchen Remodel?

McClave Builders handles kitchen remodels and whole-home renovations across Chester and Montgomery Counties, with a structured preconstruction process, transparent cost-plus pricing, and clear communication from demo through punch list. You can see examples of our work in our portfolio or check the communities we serve.

If you are thinking about a kitchen project for the coming year, reach out through our contact page or call us at (610) 300-5585 to talk through your plans.